All jobs
Hudson IT and Manpower logo

Planning Engineer | 400 kV+ Transmission Line & Substation Projects | PMC Role

Hudson IT and Manpower · Posted today

  • Gujarat, India (On-site)
  • Full-time
  • 8-12 yrs

About the role

We are currently hiring experienced Planning Engineers for a permanent PMC (Project Management Consultancy) role with exposure to 400 kV and above Transmission Line and Substation Projects.

Position: Planning Engineer – Transmission Line & Substation Projects

Role: Planning / Project Controls – PMC

Experience: 8–12 Years

Qualification: B.E. / B.Tech in Civil / Electrical Engineering

Employment: Permanent

Project Sector: Power Transmission & Substation

Project Voltage: 400 kV and above

Work Locations

Open positions are available at

  • Kutch, Gujarat
  • Jamnagar, Gujarat
  • Mumbai, Maharashtra
  • Pune, Maharashtra
  • Important: Candidates must be flexible and willing to work at any of the above locations, depending on project requirements.

Role Purpose

The Planning Engineer will work as a PMC Planning Representative and will be responsible for establishing, reviewing, monitoring, and controlling integrated project schedules for high-voltage transmission line and substation packages.

  • The role will involve close coordination with contractors, client teams, engineering, procurement, construction, testing and commissioning teams to ensure timely project execution and accurate progress reporting.

Key Responsibilities

  • Act as the PMC planning representative for transmission line and substation packages.
  • Review contractor WBS, baseline schedules, activity logic, durations, calendars, constraints, milestones, and resource loading.
  • Develop and maintain integrated schedules covering:
  • Engineering
  • Procurement
  • Construction
  • Testing
  • Commissioning
  • Energisation
  • Handover
  • Establish and monitor progress measurement methods based on BOQ, Schedule of Values, contractual milestones, and verified site quantities.
  • Prepare and review daily, weekly, monthly, two-week and three-month look-ahead schedules.
  • Prepare and monitor S-curves, resource histograms and milestone trackers.
  • Verify contractor-reported physical progress against actual site records and coordinate with engineering, procurement and construction teams.
  • Monitor critical and near-critical paths and identify delays, slippages and constraints.
  • Recommend corrective actions, recovery schedules and acceleration measures.
  • Track:
  • Drawing approvals
  • Long-lead materials
  • Manufacturing
  • Dispatch
  • Site receipt
  • Work-front readiness
  • Package interfaces
  • Support extension-of-time and delay claim assessments through event chronology, contemporaneous records and schedule-impact analysis.
  • Prepare MIS reports, dashboards, schedule narratives, risk registers and project forecasts.
  • Present planning updates and key project issues during management/project review meetings.
  • Coordinate with multiple stakeholders to ensure timely completion of project milestones.
  • Required Project Experience
  • Candidates must have hands-on planning/project-controls experience in:
  • 400 kV and above Transmission Line Projects
  • 400 kV and above AIS/GIS Substation Projects
  • High-voltage power transmission projects
  • Substation civil, structural, electrical and commissioning activities
  • Preference will be given to candidates with experience in PMC, Owner’s Engineer, Client-side or EPC project environments.
  • Technical Skills Required

Strong working knowledge of

  • Primavera P6
  • MS Project
  • Advanced MS Excel
  • Schedule development and baselining
  • Critical Path Method (CPM)
  • Progress measurement and monitoring
  • Resource planning
  • S-Curve preparation
  • Delay analysis
  • Recovery/acceleration planning
  • Procurement monitoring
  • Risk and constraint tracking
  • MIS and management reporting
  • Preferred Candidate Profile
  • The ideal candidate should have 8–12 years of proven planning and project-controls experience in high-voltage transmission line and substation projects.

The candidate should be capable of independently:

  • Reviewing and challenging contractor schedules
  • Validating baseline programmes
  • Reconciling reported progress with actual site progress
  • Identifying critical and emerging delays
  • Preparing recovery plans
  • Monitoring procurement and construction interfaces
  • Forecasting project completion
  • Preparing accurate MIS and management reports
  • Coordinating with contractors, clients and multiple project stakeholders
  • Candidate Eligibility

Mandatory

  • 8–12 years of relevant Planning / Project Controls experience
  • Experience in 400 kV+ Transmission Line and/or Substation Projects
  • Good knowledge of Primavera P6 / MS Project
  • Strong project scheduling and progress-monitoring experience
  • Willingness to work at Kutch / Jamnagar / Mumbai / Pune
  • Must be comfortable with any project location based on business requirement
  • Willing to join a permanent role

Skills

Primavera P6MS ProjectAdvanced MS ExcelSchedule development and baseliningCritical Path Method (CPM)Progress measurement and monitoringResource planningS-Curve preparationDelay analysisRecovery/acceleration planningProcurement monitoringRisk and constraint tracking