
Planning Engineer | 400 kV+ Transmission Line & Substation Projects | PMC Role
Hudson IT and Manpower · Posted today
- Gujarat, India (On-site)
- Full-time
- 8-12 yrs
About the role
We are currently hiring experienced Planning Engineers for a permanent PMC (Project Management Consultancy) role with exposure to 400 kV and above Transmission Line and Substation Projects.
Position: Planning Engineer – Transmission Line & Substation Projects
Role: Planning / Project Controls – PMC
Experience: 8–12 Years
Qualification: B.E. / B.Tech in Civil / Electrical Engineering
Employment: Permanent
Project Sector: Power Transmission & Substation
Project Voltage: 400 kV and above
Work Locations
Open positions are available at
- Kutch, Gujarat
- Jamnagar, Gujarat
- Mumbai, Maharashtra
- Pune, Maharashtra
- Important: Candidates must be flexible and willing to work at any of the above locations, depending on project requirements.
Role Purpose
The Planning Engineer will work as a PMC Planning Representative and will be responsible for establishing, reviewing, monitoring, and controlling integrated project schedules for high-voltage transmission line and substation packages.
- The role will involve close coordination with contractors, client teams, engineering, procurement, construction, testing and commissioning teams to ensure timely project execution and accurate progress reporting.
Key Responsibilities
- Act as the PMC planning representative for transmission line and substation packages.
- Review contractor WBS, baseline schedules, activity logic, durations, calendars, constraints, milestones, and resource loading.
- Develop and maintain integrated schedules covering:
- Engineering
- Procurement
- Construction
- Testing
- Commissioning
- Energisation
- Handover
- Establish and monitor progress measurement methods based on BOQ, Schedule of Values, contractual milestones, and verified site quantities.
- Prepare and review daily, weekly, monthly, two-week and three-month look-ahead schedules.
- Prepare and monitor S-curves, resource histograms and milestone trackers.
- Verify contractor-reported physical progress against actual site records and coordinate with engineering, procurement and construction teams.
- Monitor critical and near-critical paths and identify delays, slippages and constraints.
- Recommend corrective actions, recovery schedules and acceleration measures.
- Track:
- Drawing approvals
- Long-lead materials
- Manufacturing
- Dispatch
- Site receipt
- Work-front readiness
- Package interfaces
- Support extension-of-time and delay claim assessments through event chronology, contemporaneous records and schedule-impact analysis.
- Prepare MIS reports, dashboards, schedule narratives, risk registers and project forecasts.
- Present planning updates and key project issues during management/project review meetings.
- Coordinate with multiple stakeholders to ensure timely completion of project milestones.
- Required Project Experience
- Candidates must have hands-on planning/project-controls experience in:
- 400 kV and above Transmission Line Projects
- 400 kV and above AIS/GIS Substation Projects
- High-voltage power transmission projects
- Substation civil, structural, electrical and commissioning activities
- Preference will be given to candidates with experience in PMC, Owner’s Engineer, Client-side or EPC project environments.
- Technical Skills Required
Strong working knowledge of
- Primavera P6
- MS Project
- Advanced MS Excel
- Schedule development and baselining
- Critical Path Method (CPM)
- Progress measurement and monitoring
- Resource planning
- S-Curve preparation
- Delay analysis
- Recovery/acceleration planning
- Procurement monitoring
- Risk and constraint tracking
- MIS and management reporting
- Preferred Candidate Profile
- The ideal candidate should have 8–12 years of proven planning and project-controls experience in high-voltage transmission line and substation projects.
The candidate should be capable of independently:
- Reviewing and challenging contractor schedules
- Validating baseline programmes
- Reconciling reported progress with actual site progress
- Identifying critical and emerging delays
- Preparing recovery plans
- Monitoring procurement and construction interfaces
- Forecasting project completion
- Preparing accurate MIS and management reports
- Coordinating with contractors, clients and multiple project stakeholders
- Candidate Eligibility
Mandatory
- 8–12 years of relevant Planning / Project Controls experience
- Experience in 400 kV+ Transmission Line and/or Substation Projects
- Good knowledge of Primavera P6 / MS Project
- Strong project scheduling and progress-monitoring experience
- Willingness to work at Kutch / Jamnagar / Mumbai / Pune
- Must be comfortable with any project location based on business requirement
- Willing to join a permanent role